United States βΊ Grid βΊ Interconnection queues βΊ New York
OTHER Β· NYISOTaylor Biomass
Taylor Biomass is a 22.5 MW other request withdrawn in the NYISO interconnection queue, in Orange County, New York, connecting to CHGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2009 (completed)
- Withdrawn / abandonedJun 2021 (project stopped here)
- ConsentedOct 2013 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 349
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CHGE
- Developer
- Taylor Biomass Energy-Montgomery, LLC
- Connection point (POI)
- Maybrook - Rock Tavern 69kV
- Location
- Orange County, New York
- Technology
- Other: 22.5 MW
- Total requested
- 22.5 MW
- Queue status
- Withdrawn
- Entered queue
- 30 December 2009
- Agreement signed
- 15 October 2013
- Withdrawn
- June 2021
Location
Marker shows the centre of Orange County; the queue data does not give exact sites.
Other requests in Orange County
- Sugar Loaf Energy Storage IBattery storage Β· 300 MW Β· in study
- Arch 4Battery storage Β· 150 MW Β· in study
- Farmhouse BESSBattery storage Β· 150 MW Β· in study
- Arch 3Battery storage Β· 100 MW Β· in study
- Little Pond SolarSolar Β· 20.0 MW Β· in study
- CPV Valley Energy CenterGas Β· 691 MW Β· built
- CPV Valley Energy CenterGas Β· 691 MW Β· built
- Swinging Bridge Unit 3Hydro Β· 1.2 MW Β· built
- Swinging Bridge Unit 3Hydro Β· 1.2 MW Β· built
- CPV Valley IIGas Β· 820 MW Β· withdrawn
- Wawayanda Energy CenterGas Β· 500 MW Β· withdrawn
- Sugar Loaf Energy Storage IIBattery storage Β· 300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem