United States βΊ Grid βΊ Interconnection queues βΊ Ohio
ONSHORE WIND Β· PJMOnshore wind project W2-068, Mercer County
Onshore wind project W2-068, Mercer County is a 150 MW onshore wind request withdrawn in the PJM interconnection queue, in Mercer County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2010 (completed)
- Withdrawn / abandonedJan 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W2-068
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Bluff Point 138kV
- Location
- Mercer County, Ohio
- Technology
- Wind: 150 MW
- Total requested
- 150 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 30 July 2010
- Proposed online date
- December 2011
- Withdrawn
- January 2012
Location
Marker shows the centre of Mercer County; the queue data does not give exact sites.
Other requests in Mercer County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem