United States › Grid › Interconnection queues › Pennsylvania
ONSHORE WIND · PJMChestnut Flats WF
Chestnut Flats WF is a 38.0 MW onshore wind request built and operating in the PJM interconnection queue, in Blair County, Pennsylvania, connecting to PENELEC.
Request details
- Queue ID
- Q53
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Summit-West Fall 115kV
- Location
- Blair County, Pennsylvania
- Technology
- Wind: 38.0 MW
- Total requested
- 38.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Operational
- Entered queue
- 23 June 2006
- Agreement signed
- 20 November 2009
- Proposed online date
- May 2011
- Came online
- May 2011
Location
Marker shows the centre of Blair County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Blair County
- BL-Hileman HollowSolar · 20.0 MW · agreement signed
- Onshore wind project Q56, Blair CountyOnshore wind · 180 MW · withdrawn
- Solar project AE2-264, Blair CountySolar · 80.0 MW · withdrawn
- Battery storage project AA1-115, Blair CountyBattery storage · 20.0 MW · withdrawn
- Solar project AG1-280, Blair CountySolar · 20.0 MW · withdrawn
- Antis Solar FacilitySolar · 7.3 MW · withdrawn
- Other project W3-040, Blair CountyOther · 3.8 MW · withdrawn
- BL-KettleSolar + storage · 3.0 MW · withdrawn
- BR-SwissdaleSolar + storage · 3.0 MW · withdrawn
- Other project V2-002, Blair CountyOther · 2.7 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem