United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
SOLAR Β· SOUTHEASTSolar project 569072, Davidson County
Solar project 569072, Davidson County is a 80.0 MW solar request withdrawn in the Southeast interconnection queue, in Davidson County, North Carolina, connecting to Duke Energy Carolinas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 569072
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Carolinas
- Connection point (POI)
- High Point WH 100 kV
- Location
- Davidson County, North Carolina
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Other
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 27 June 2022
Location
Marker shows the centre of Davidson County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Davidson County
- Solar project 196564, Davidson CountySolar Β· 80.0 MW Β· agreement signed
- Gas project 977731, Davidson CountyGas Β· 1,395 MW Β· in study
- Gas project 73054, Davidson CountyGas Β· 1,503 MW Β· withdrawn
- Gas project 567758, Davidson CountyGas Β· 500 MW Β· withdrawn
- Solar project 126060, Davidson CountySolar Β· 60.0 MW Β· withdrawn
- Solar project 920657, Davidson CountySolar Β· 28.8 MW Β· withdrawn
- Solar project 963469, Davidson CountySolar Β· 28.8 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem