United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Setauket Fuel Cell

Setauket Fuel Cell is a 20.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Suffolk County, New York, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2019 (completed)
  2. Withdrawn / abandonedJul 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
893
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
FourGen LLC
Connection point (POI)
Terryville Substation 69kV
Location
Suffolk County, New York
Technology
Other Storage: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
15 July 2019
Withdrawn
July 2020

Location

Marker shows the centre of Suffolk County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Suffolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem