🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Altona Energy Storage

Altona Energy Storage is a 40.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Clinton County, New York, connecting to NYSEG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C24-140
Grid region
NYISO (New York)
Utility / transmission owner
NYSEG
Developer
Emeren US, LLC
Connection point (POI)
Flatrock 46kV
Location
Clinton County, New York
Technology
Battery: 40.0 MW
Total requested
40.0 MW
Queue status
Withdrawn
Entered queue
9 September 2024

Location

Marker shows the centre of Clinton County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Clinton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem