United States βΊ Grid βΊ Interconnection queues βΊ Alabama
SOLAR Β· SOUTHEASTSolar project IC-984, Mobile County
Solar project IC-984, Mobile County is a 160 MW solar request withdrawn in the Southeast interconnection queue, in Mobile County, Alabama, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedNov 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-984
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Location
- Mobile County, Alabama
- Technology
- Solar: 160 MW
- Total requested
- 160 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 27 September 2021
- Withdrawn
- November 2021
Location
Marker shows the centre of Mobile County; the queue data does not give exact sites.
Other requests in Mobile County
- Gas project 25-IC-1382, Mobile CountyGas Β· 707 MW Β· in study
- Solar + storage project 25-IC-1315, Mobile CountySolar + storage Β· 295 MW Β· in study
- Solar project 25-IC-1368, Mobile CountySolar Β· 200 MW Β· in study
- Gas project 25-IC-1344, Mobile CountyGas Β· 14.0 MW Β· in study
- Gas project IC-1158, Mobile CountyGas Β· 685 MW Β· suspended
- Battery storage project IC-1091, Mobile CountyBattery storage Β· 300 MW Β· suspended
- APC Barry 8 CCGas Β· 685 MW Β· built
- Hog Bayou (Calpine)Gas Β· 230 MW Β· built
- MescoGas Β· 50.0 MW Β· built
- Gas project IC-063, Mobile CountyGas Β· 630 MW Β· withdrawn
- Solar + storage project IC-845, Mobile CountySolar + storage Β· 300 MW Β· withdrawn
- Solar + storage project IC-844, Mobile CountySolar + storage Β· 300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem