HYDRO Β· PJMHydro project Z2-035, Morgan County
Hydro project Z2-035, Morgan County is a 4.0 MW hydro request withdrawn in the PJM interconnection queue, in Morgan County, Ohio, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2014 (completed)
- Withdrawn / abandonedSep 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Z2-035
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Clean River Power MR-5 (Malta)
- Location
- Morgan County, Ohio
- Technology
- Hydro: 4.0 MW
- Total requested
- 4.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 27 February 2014
- Proposed online date
- December 2016
- Withdrawn
- September 2014
Location
Marker shows the centre of Morgan County; the queue data does not give exact sites.
Other requests in Morgan County
- Solar + storage project AG2-355, Morgan CountySolar + storage Β· 125 MW Β· withdrawn
- Solar project AG2-018, Morgan CountySolar Β· 105 MW Β· withdrawn
- Battery storage project AI1-121, Morgan CountyBattery storage Β· 90.0 MW Β· withdrawn
- Battery storage project AH2-283, Morgan CountyBattery storage Β· 50.0 MW Β· withdrawn
- Hydro project Z2-036, Morgan CountyHydro Β· 4.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem