United States βΊ Grid βΊ Interconnection queues βΊ Kansas
ONSHORE WIND Β· SPPOnshore wind project GEN-2024-094, Meade County
Onshore wind project GEN-2024-094, Meade County is a 200 MW onshore wind request withdrawn in the SPP interconnection queue, in Meade County, Kansas, connecting to SUNC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2024-094
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SUNC
- Connection point (POI)
- Cudahy 115 kV Substation
- Location
- Meade County, Kansas
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 1 March 2025
- Proposed online date
- June 2028
- Withdrawn
- August 2025
Location
Marker shows the centre of Meade County; the queue data does not give exact sites.
Other requests in Meade County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem