United States βΊ Grid βΊ Interconnection queues βΊ Illinois
SOLAR Β· MISOSolar project J3044, Tazewell County
Solar project J3044, Tazewell County is a 200 MW solar request withdrawn in the MISO interconnection queue, in Tazewell County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3044
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- Edwards
- Location
- Tazewell County, Illinois
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- November 2026
- Withdrawn
- October 2025
Location
Marker shows the centre of Tazewell County; the queue data does not give exact sites.
Other requests in Tazewell County
- Battery storage project J3946, Tazewell CountyBattery storage Β· 300 MW Β· in study
- Solar project AG2-363, Tazewell CountySolar Β· 300 MW Β· in study
- Onshore wind project J1926, Tazewell CountyOnshore wind Β· 200 MW Β· in study
- Battery storage project J3298, Tazewell CountyBattery storage Β· 200 MW Β· in study
- Solar project AG2-364, Tazewell CountySolar Β· 200 MW Β· in study
- Battery storage project J2575, Tazewell CountyBattery storage Β· 198 MW Β· in study
- Onshore wind project J3905, Tazewell CountyOnshore wind Β· 175 MW Β· in study
- Battery storage project J3904, Tazewell CountyBattery storage Β· 175 MW Β· in study
- Solar project J1653, Tazewell CountySolar Β· 150 MW Β· in study
- Onshore wind project J3456, Tazewell CountyOnshore wind Β· 100 MW Β· in study
- Onshore wind project J1725, Tazewell CountyOnshore wind Β· 100 MW Β· in study
- Battery storage project J1882, Tazewell CountyBattery storage Β· 45.0 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem