United States › Grid › Interconnection queues › Oregon

ONSHORE WIND · WEST

Klondike II Repower

Klondike II Repower is a 6.0 MW onshore wind request built and operating in the West interconnection queue, in Sherman County, Oregon, connecting to Klondike Wind Power II, LLC.

Queue statusOperating
  1. PlanningQueued Mar 2019 (completed)
  2. ConsentedSep 2020 (completed)
  3. Construction (completed)
  4. OperatingTarget Dec 2020 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
G0618
Grid region
West (non-ISO utilities)
Utility / transmission owner
Klondike Wind Power II, LLC
Developer
Klondike Wind Power II, LLC
Connection point (POI)
BPA's John Day 230 kV
Location
Sherman County, Oregon
Technology
Wind: 6.0 MW
Total requested
6.0 MW
Service type
Energy only (ERIS)
Study phase
This is an incremental increase in nameplate capacity to G096, not an increase in the injected power as described in the
Queue status
Operational
Entered queue
22 March 2019
Agreement signed
15 September 2020
Proposed online date
December 2020

Location

Marker shows the centre of Sherman County; the queue data does not give exact sites.

Power plants in Oregon · Transmission lines in Oregon

Other requests in Sherman County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem