United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

BATTERY STORAGE Β· WEST

Battery storage project 138, King County

Battery storage project 138, King County is a 175 MW battery storage request withdrawn in the West interconnection queue, in King County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
138
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Black Diamond 115kV Substation
Location
King County, Washington
Technology
Battery: 175 MW
Total requested
175 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
19 May 2023
Proposed online date
June 2025

Location

Marker shows the centre of King County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in King County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem