United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

BATTERY STORAGE Β· NYISO

Sandlot

Sandlot is a 600 MW battery storage request withdrawn in the NYISO interconnection queue, in Suffolk County, New York, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1485
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
Sandlot Energy LLC
Connection point (POI)
Northport - Pilgrim 138kV Line (138-679A&B)
Location
Suffolk County, New York
Technology
Battery: 600 MW
Total requested
600 MW
Queue status
Withdrawn
Entered queue
15 December 2022

Location

Marker shows the centre of Suffolk County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Suffolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem