United States β€Ί Grid β€Ί Interconnection queues β€Ί Utah

SOLAR Β· WEST

Solar project C2-120, Utah County

Solar project C2-120, Utah County is a 20.0 MW solar request withdrawn in the West interconnection queue, in Utah County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C2-120
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Santaquin-Nebo #2 Burgin Tap transmission line
Location
Utah County, Utah
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
Facility Study
Queue status
Withdrawn
Entered queue
13 May 2022
Proposed online date
December 2025

Location

Marker shows the centre of Utah County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Utah County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem