United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

GAS Β· PJM

Morris Cogen

Morris Cogen is a 12.6 MW gas request built and operating in the PJM interconnection queue, in Grundy County, Illinois, connecting to ComEd.

Queue statusOperating
  1. PlanningQueued Nov 2012 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMar 2014 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Y2-113
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Morris 138kV
Location
Grundy County, Illinois
Technology
Gas: 12.6 MW
Total requested
12.6 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
2 November 2012
Proposed online date
October 2012
Came online
March 2014

Location

Marker shows the centre of Grundy County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Grundy County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem