United States βΊ Grid βΊ Interconnection queues βΊ Oregon
BATTERY STORAGE Β· WESTBattery storage project 24-249, Washington County
Battery storage project 24-249, Washington County is a 200 MW battery storage request withdrawn in the West interconnection queue, in Washington County, Oregon, connecting to Portland General Electric.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24-249
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Portland General Electric
- Connection point (POI)
- Groveland 115kV Substation
- Location
- Washington County, Oregon
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 24 May 2024
- Proposed online date
- December 2027
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- Battery storage project 21-104, Washington CountyBattery storage Β· 400 MW Β· agreement signed
- Battery storage project 21-099, Washington CountyBattery storage Β· 200 MW Β· agreement signed
- Battery storage project 21-100, Washington CountyBattery storage Β· 200 MW Β· agreement signed
- Battery storage project 23-221, Washington CountyBattery storage Β· 400 MW Β· in study
- Battery storage project 24-245, Washington CountyBattery storage Β· 100 MW Β· in study
- Battery storage project 20-082, Washington CountyBattery storage Β· 200 MW Β· built
- Battery storage project 21-105, Washington CountyBattery storage Β· 800 MW Β· withdrawn
- Wind + storage project 23-223, Washington CountyWind + storage Β· 400 MW Β· withdrawn
- Battery storage project 24-254, Washington CountyBattery storage Β· 200 MW Β· withdrawn
- Battery storage project 24-256, Washington CountyBattery storage Β· 200 MW Β· withdrawn
- Battery storage project 24-246, Washington CountyBattery storage Β· 200 MW Β· withdrawn
- Onshore wind project 23-220, Washington CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem