United States β€Ί Grid β€Ί Interconnection queues β€Ί Indiana

SOLAR + STORAGE Β· MISO

Solar + storage project J2895, Clark County

Solar + storage project J2895, Clark County is a 120 MW solar + storage request withdrawn in the MISO interconnection queue, in Clark County, Indiana, connecting to DUKE ENERGY INDIANA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedAug 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2895
Grid region
MISO (Midcontinent)
Utility / transmission owner
DUKE ENERGY INDIANA
Connection point (POI)
Bethlehem 138kV Substation
Location
Clark County, Indiana
Technology
Solar: 120 MW Β· Battery
Total requested
120 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
15 September 2022
Proposed online date
April 2025
Withdrawn
August 2025

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem