BATTERY STORAGE Β· MISOBattery storage project J3726, Hancock County
Battery storage project J3726, Hancock County is a 200 MW battery storage request withdrawn in the MISO interconnection queue, in Hancock County, Kentucky, connecting to BIG RIVERS ELECTRIC CORPORATION.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2024 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3726
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- BIG RIVERS ELECTRIC CORPORATION
- Connection point (POI)
- Skillman
- Location
- Hancock County, Kentucky
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 18 March 2024
- Proposed online date
- January 2027
- Withdrawn
- December 2025
Location
Marker shows the centre of Hancock County; the queue data does not give exact sites.
Other requests in Hancock County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem