United States βΊ Grid βΊ Interconnection queues βΊ New Jersey
BATTERY STORAGE Β· PJM59 Newburgh
59 Newburgh is a 0.3 MW battery storage request withdrawn in the PJM interconnection queue, in Warren County, New Jersey, connecting to JCPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2017 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AC2-144
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- JCPL
- Connection point (POI)
- Newburgh 12.47kV
- Location
- Warren County, New Jersey
- Technology
- Battery: 0.3 MW
- Total requested
- 0.3 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 28 March 2017
- Proposed online date
- June 2018
- Withdrawn
- March 2021
Location
Marker shows the centre of Warren County; the queue data does not give exact sites.
Power plants in New Jersey Β· Transmission lines in New Jersey
Other requests in Warren County
- Harmony Plains Solar and Storage FacilitySolar + storage Β· 70.0 MW Β· agreement signed
- Mansfield #3Battery storage Β· 20.0 MW Β· agreement signed
- Warren Glen StorageBattery storage Β· 20.0 MW Β· agreement signed
- Washington Solar PH IISolar Β· 11.0 MW Β· agreement signed
- Solar project AI1-137, Warren CountySolar Β· 155 MW Β· in study
- Solar project AI1-120, Warren CountySolar Β· 51.6 MW Β· in study
- Solar project AI1-118, Warren CountySolar Β· 37.6 MW Β· in study
- Solar project AI2-437, Warren CountySolar Β· 20.0 MW Β· in study
- Solar project AG2-625, Warren CountySolar Β· 19.6 MW Β· in study
- Kober Solar FarmSolar Β· 19.3 MW Β· in study
- Solar project AG2-626, Warren CountySolar Β· 12.5 MW Β· in study
- Alpha Battery Storage FacilityBattery storage Β· 20.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem