Solar + storage project C2-154, Utah County

Solar + storage project C2-154, Utah County is a 400 MW solar + storage request withdrawn in the West interconnection queue, in Utah County, Utah, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
C2-154
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Clover-Limber transmission line
Location
Utah County, Utah
Technology
Solar: 400 MW Β· Battery
Total requested
400 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
15 May 2022
Proposed online date
December 2025

Location

Marker shows the centre of Utah County; the queue data does not give exact sites.

Power plants in Utah Β· Transmission lines in Utah

Other requests in Utah County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem