United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR + STORAGE Β· PJMSolar + storage project AF2-269
Solar + storage project AF2-269 is a 3.7 MW solar + storage request withdrawn in the PJM interconnection queue, connecting to ME.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedApr 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-269
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ME
- Connection point (POI)
- Adams Y Solar II
- Location
- Pennsylvania
- Technology
- Solar: 3.7 MW Β· Battery
- Total requested
- 3.7 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 27 March 2020
- Proposed online date
- July 2021
- Withdrawn
- April 2020
Location
No county location in the queue data.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem