BATTERY STORAGE Β· MISOBattery storage project J2300, Greene County
Battery storage project J2300, Greene County is a 50.0 MW battery storage request withdrawn in the MISO interconnection queue, in Greene County, Arkansas, connecting to ARKANSAS ELECTRIC COOPERATIVE CORPORATION.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2021 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2300
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ARKANSAS ELECTRIC COOPERATIVE CORPORATION
- Connection point (POI)
- Gainesville Switching Station
- Location
- Greene County, Arkansas
- Technology
- Battery: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 30 November 2021
- Proposed online date
- April 2025
- Withdrawn
- March 2025
Location
Marker shows the centre of Greene County; the queue data does not give exact sites.
Other requests in Greene County
- Solar project J2298, Greene CountySolar Β· 200 MW Β· in study
- Solar project J4035, Greene CountySolar Β· 113 MW Β· withdrawn
- Solar project J3578, Greene CountySolar Β· 100 MW Β· withdrawn
- Solar project J2299, Greene CountySolar Β· 100 MW Β· withdrawn
- Solar project J3675, Greene CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem