SOLAR + STORAGE Β· MISO

Solar + storage project J3821, Walker County

Solar + storage project J3821, Walker County is a 175 MW solar + storage request withdrawn in the MISO interconnection queue, in Walker County, Texas, connecting to ENTERGY TEXAS, INC..

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2024 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3821
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY TEXAS, INC.
Connection point (POI)
RIVTRIN
Location
Walker County, Texas
Technology
Solar: 175 MW Β· Battery
Total requested
175 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Withdrawn
Entered queue
18 April 2024
Proposed online date
August 2028
Withdrawn
December 2025

Location

Marker shows the centre of Walker County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Walker County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem