United States β€Ί Grid β€Ί Interconnection queues β€Ί West Virginia

SOLAR Β· PJM

Solar project AG1-528

Solar project AG1-528 is a 225 MW solar request withdrawn in the PJM interconnection queue, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedJan 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG1-528
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Tenmile - Sundial 138 kV
Location
West Virginia
Technology
Solar: 225 MW
Total requested
225 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study
Queue status
Withdrawn
Entered queue
30 September 2020
Proposed online date
June 2023
Withdrawn
January 2025

Location

No county location in the queue data.

Power plants in West Virginia Β· Transmission lines in West Virginia

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem