United States β€Ί Grid β€Ί Interconnection queues β€Ί Colorado

SOLAR Β· WEST

Solar project BHCT G30, Pueblo County

Solar project BHCT G30, Pueblo County is a 80.0 MW solar request withdrawn in the West interconnection queue, in Pueblo County, Colorado, connecting to Black Hills Colorado Electric.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
BHCT G30
Grid region
West (non-ISO utilities)
Utility / transmission owner
Black Hills Colorado Electric
Connection point (POI)
West Station 115kV
Location
Pueblo County, Colorado
Technology
Solar: 80.0 MW
Total requested
80.0 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
23 August 2021
Proposed online date
September 2024

Location

Marker shows the centre of Pueblo County; the queue data does not give exact sites.

Power plants in Colorado Β· Transmission lines in Colorado

Other requests in Pueblo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem