United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
ONSHORE WIND Β· SOUTHEASTOnshore wind project 8603, Carteret County
Onshore wind project 8603, Carteret County is a 200 MW onshore wind request withdrawn in the Southeast interconnection queue, in Carteret County, North Carolina, connecting to Duke Energy Progress.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2012 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 8603
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Developer
- Masked
- Connection point (POI)
- Havelock - Morehead Wildwood North 115 KV
- Location
- Carteret County, North Carolina
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 25 January 2012
Location
Marker shows the centre of Carteret County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Carteret County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem