United States › Grid › Interconnection queues › New Mexico
ONSHORE WIND · WESTSame as project below
Same as project below is a 300 MW onshore wind request withdrawn in the West interconnection queue, in Socorro County, New Mexico, connecting to El Paso Electric Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2010 (completed)
- Withdrawn / abandonedApr 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 30
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- El Paso Electric Company
- Connection point (POI)
- Westmesa-Arroyo 345 kV line near of Belen, NM
- Location
- Socorro County, New Mexico
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 23 April 2010
- Proposed online date
- December 2013
- Withdrawn
- April 2012
Location
Marker shows the centre of Socorro County; the queue data does not give exact sites.
Power plants in New Mexico · Transmission lines in New Mexico
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem