United States › Grid › Interconnection queues › New Mexico

ONSHORE WIND · WEST

Same as project below

Same as project below is a 300 MW onshore wind request withdrawn in the West interconnection queue, in Socorro County, New Mexico, connecting to El Paso Electric Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2010 (completed)
  2. Withdrawn / abandonedApr 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
30
Grid region
West (non-ISO utilities)
Utility / transmission owner
El Paso Electric Company
Connection point (POI)
Westmesa-Arroyo 345 kV line near of Belen, NM
Location
Socorro County, New Mexico
Technology
Wind: 300 MW
Total requested
300 MW
Service type
NRIS and ERIS
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
23 April 2010
Proposed online date
December 2013
Withdrawn
April 2012

Location

Marker shows the centre of Socorro County; the queue data does not give exact sites.

Power plants in New Mexico · Transmission lines in New Mexico

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem