Replacing 179 MW Coal with 179 MW Solar; Edwards Unit 3

Replacing 179 MW Coal with 179 MW Solar; Edwards Unit 3 is a 185 MW other request withdrawn in the MISO interconnection queue, in Tazewell County, Illinois, connecting to AMEREN ILLINOIS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2024 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R1056
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN ILLINOIS
Connection point (POI)
E.D. Edwards 138kV
Location
Tazewell County, Illinois
Technology
Solar: 185 MW · Other
Total requested
185 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
12 July 2024
Proposed online date
September 2025
Withdrawn
December 2025

Location

Marker shows the centre of Tazewell County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Tazewell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem