United States βΊ Grid βΊ Interconnection queues βΊ Michigan
SOLAR Β· MISOSolar project J3227, Ogemaw County
Solar project J3227, Ogemaw County is a 80.0 MW solar request withdrawn in the MISO interconnection queue, in Ogemaw County, Michigan, connecting to METC.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3227
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- METC
- Connection point (POI)
- Gallagher to Livingston 345 kV Segment on the Livingston βΒ’βΓΒ¨βΓΓΊ Tittabawassee 345 kV Line
- Location
- Ogemaw County, Michigan
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- December 2025
- Withdrawn
- August 2025
Location
Marker shows the centre of Ogemaw County; the queue data does not give exact sites.
Other requests in Ogemaw County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem