United States β€Ί Grid β€Ί Interconnection queues β€Ί Michigan

SOLAR Β· MISO

Solar project J3227, Ogemaw County

Solar project J3227, Ogemaw County is a 80.0 MW solar request withdrawn in the MISO interconnection queue, in Ogemaw County, Michigan, connecting to METC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2022 (completed)
  2. Withdrawn / abandonedAug 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J3227
Grid region
MISO (Midcontinent)
Utility / transmission owner
METC
Connection point (POI)
Gallagher to Livingston 345 kV Segment on the Livingston βˆšΒ’β€šΓ‡Β¨β€šΓ„ΓΊ Tittabawassee 345 kV Line
Location
Ogemaw County, Michigan
Technology
Solar: 80.0 MW
Total requested
80.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
14 September 2022
Proposed online date
December 2025
Withdrawn
August 2025

Location

Marker shows the centre of Ogemaw County; the queue data does not give exact sites.

Power plants in Michigan Β· Transmission lines in Michigan

Other requests in Ogemaw County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem