United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

SOLAR + STORAGE Β· PJM

Solar + storage project AG2-390, Adams County

Solar + storage project AG2-390, Adams County is a 5.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Adams County, Pennsylvania, connecting to PECO.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2021 (completed)
  2. Withdrawn / abandonedApr 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG2-390
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PECO
Connection point (POI)
Upper Providence 34.5 kV
Location
Adams County, Pennsylvania
Technology
Solar: 5.0 MW Β· Battery
Total requested
5.0 MW
Service type
Energy only (ERIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
30 March 2021
Proposed online date
June 2022
Withdrawn
April 2024

Location

Marker shows the centre of Adams County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Adams County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem