United States βΊ Grid βΊ Interconnection queues βΊ Montana
ONSHORE WIND Β· WESTOnshore wind project G0373, Flathead County
Onshore wind project G0373, Flathead County is a 200 MW onshore wind request withdrawn in the West interconnection queue, in Flathead County, Montana.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2009 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G0373
- Grid region
- West (non-ISO utilities)
- Connection point (POI)
- 230 kV Libby-Haskill line
- Location
- Flathead County, Montana
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 29 June 2009
- Proposed online date
- April 2012
Location
Marker shows the centre of Flathead County; the queue data does not give exact sites.
Other requests in Flathead County
- Other project G0710, Flathead CountyOther Β· 1.6 MW Β· in study
- Battery storage project G1085, Flathead CountyBattery storage Β· 0.3 MW Β· in study
- Stoltze Land and Lumber ProjectOther Β· 3.0 MW Β· built
- Flathead LFGTE ProjectOther Β· 2.0 MW Β· built
- Whitefish In-Line Hydroelectric ProjectHydro Β· 1.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem