πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Minnesota

ONSHORE WIND Β· MISO

Onshore wind project H017, Cottonwood County

Onshore wind project H017, Cottonwood County is a 100 MW onshore wind request withdrawn in the MISO interconnection queue, in Cottonwood County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2008 (completed)
  2. Withdrawn / abandonedJun 2012 (project stopped here)
  3. ConsentedJun 2012 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
H017
Grid region
MISO (Midcontinent)
Connection point (POI)
Lakefield Junction 345kV Substation
Location
Cottonwood County, Minnesota
Technology
Wind: 100 MW
Total requested
100 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
30 April 2008
Agreement signed
26 June 2012
Proposed online date
December 2009
Withdrawn
June 2012

Location

Marker shows the centre of Cottonwood County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Cottonwood County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem