Onshore wind project GEN-2016-034, Banner County

Onshore wind project GEN-2016-034, Banner County is a 90.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Banner County, Nebraska, connecting to WAPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2016 (completed)
  2. Withdrawn / abandonedDec 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-034
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
WAPA
Connection point (POI)
Laramie River Station - Sidney 345kV
Location
Banner County, Nebraska
Technology
Wind: 90.0 MW
Total requested
90.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
31 March 2016
Proposed online date
June 2018
Withdrawn
December 2020

Location

Marker shows the centre of Banner County; the queue data does not give exact sites.