United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
ONSHORE WIND Β· SPPOnshore wind project GEN-2016-034, Banner County
Onshore wind project GEN-2016-034, Banner County is a 90.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Banner County, Nebraska, connecting to WAPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2016 (completed)
- Withdrawn / abandonedDec 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2016-034
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WAPA
- Connection point (POI)
- Laramie River Station - Sidney 345kV
- Location
- Banner County, Nebraska
- Technology
- Wind: 90.0 MW
- Total requested
- 90.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 31 March 2016
- Proposed online date
- June 2018
- Withdrawn
- December 2020
Location
Marker shows the centre of Banner County; the queue data does not give exact sites.
Other requests in Banner County
- Onshore wind project GI-2018-18, Banner CountyOnshore wind Β· 1,000 MW Β· withdrawn
- Onshore wind project GI-1405, Banner CountyOnshore wind Β· 600 MW Β· withdrawn
- Solar project GEN-2018-045, Banner CountySolar Β· 550 MW Β· withdrawn
- Onshore wind project GI-2018-17, Banner CountyOnshore wind Β· 502 MW Β· withdrawn
- Onshore wind project GI-2018-16, Banner CountyOnshore wind Β· 502 MW Β· withdrawn
- Onshore wind project GI-2018-10, Banner CountyOnshore wind Β· 401 MW Β· withdrawn
- Onshore wind project GI-2018-7, Banner CountyOnshore wind Β· 401 MW Β· withdrawn
- Onshore wind project GI-2018-12, Banner CountyOnshore wind Β· 401 MW Β· withdrawn
- Onshore wind project GI-2018-8, Banner CountyOnshore wind Β· 401 MW Β· withdrawn
- Onshore wind project GEN-2018-046, Banner CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project GI-2018-14, Banner CountyOnshore wind Β· 350 MW Β· withdrawn
- Onshore wind project GI-2018-13, Banner CountyOnshore wind Β· 350 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem