United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Wading River Energy Center

Wading River Energy Center is a 50.0 MW battery storage request withdrawn in the NYISO interconnection queue, in Suffolk County, New York, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1114
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
Clean Energy Generation, LLC
Connection point (POI)
Wading River 138 kV
Location
Suffolk County, New York
Technology
Battery: 50.0 MW
Total requested
50.0 MW
Queue status
Withdrawn
Entered queue
19 November 2020

Location

Marker shows the centre of Suffolk County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Suffolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem