United States β€Ί Grid β€Ί Interconnection queues β€Ί New York

SOLAR Β· NYISO

Wawayanda Solar

Wawayanda Solar is a 12.6 MW solar request withdrawn in the NYISO interconnection queue, in Orange County, New York, connecting to O&R.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2021 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1147
Grid region
NYISO (New York)
Utility / transmission owner
O&R
Developer
Wawayanda Solar 1, LLC
Connection point (POI)
Westtown to Shoemaker 69 kV Line #11
Location
Orange County, New York
Technology
Solar: 12.6 MW
Total requested
12.6 MW
Queue status
Withdrawn
Entered queue
26 February 2021
Withdrawn
October 2023

Location

Marker shows the centre of Orange County; the queue data does not give exact sites.

Power plants in New York Β· Transmission lines in New York

Other requests in Orange County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem