United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
OTHER Β· SOUTHEASTOther project PP00032, Wake County
Other project PP00032, Wake County is a 100 MW other request withdrawn in the Southeast interconnection queue, in Wake County, North Carolina, connecting to Duke Energy Progress.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2025 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- PP00032
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Connection point (POI)
- Harris - Wake 230
- Location
- Wake County, North Carolina
- Technology
- Other: 100 MW
- Total requested
- 100 MW
- Study phase
- Provisional IR Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 6 June 2025
- Proposed online date
- January 2028
Location
Marker shows the centre of Wake County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Wake County
- Other project 897777, Wake CountyOther Β· 2.0 MW Β· under construction
- Battery storage project 38056, Wake CountyBattery storage Β· 100 MW Β· agreement signed
- Battery storage project 566170, Wake CountyBattery storage Β· 56.0 MW Β· agreement signed
- Other project 977298, Wake CountyOther Β· 300 MW Β· in study
- Other project PP00041, Wake CountyOther Β· 300 MW Β· in study
- Solar project 919393, Wake CountySolar Β· 100 MW Β· in study
- Nuclear project 24751, Wake CountyNuclear Β· 14.0 MW Β· built
- Gas project 30612, Wake CountyGas Β· 1,350 MW Β· withdrawn
- Gas project 17238, Wake CountyGas Β· 1,235 MW Β· withdrawn
- Nuclear project 41400, Wake CountyNuclear Β· 1,125 MW Β· withdrawn
- Battery storage project 899005, Wake CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project 568608, Wake CountySolar Β· 187 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem