United States βΊ Grid βΊ Interconnection queues βΊ Kansas
ONSHORE WIND Β· SPPOnshore wind project GEN-2008-097, Reno County
Onshore wind project GEN-2008-097, Reno County is a 100 MW onshore wind request withdrawn in the SPP interconnection queue, in Reno County, Kansas, connecting to WERE.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2008 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2008-097
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WERE
- Location
- Reno County, Kansas
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 22 August 2008
- Proposed online date
- December 2011
Location
Marker shows the centre of Reno County; the queue data does not give exact sites.
Other requests in Reno County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem