United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AE2-179, Pike County
Solar project AE2-179, Pike County is a 78.0 MW solar request withdrawn in the PJM interconnection queue, in Pike County, Ohio, connecting to OVEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedApr 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-179
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- OVEC
- Connection point (POI)
- Lick-Waverly 115kV
- Location
- Pike County, Ohio
- Technology
- Solar: 78.0 MW
- Total requested
- 78.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 18 March 2019
- Proposed online date
- October 2021
- Withdrawn
- April 2019
Location
Marker shows the centre of Pike County; the queue data does not give exact sites.