πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project G0325, Grant County

Onshore wind project G0325, Grant County is a 130 MW onshore wind request withdrawn in the West interconnection queue, in Grant County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0325
Grid region
West (non-ISO utilities)
Connection point (POI)
A point on BPAβ€šΓ„Γ΄s Midway-Rocky Ford 230kV line
Location
Grant County, Washington
Technology
Wind: 130 MW
Total requested
130 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
29 April 2008
Proposed online date
December 2011

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem