United States βΊ Grid βΊ Interconnection queues βΊ Virginia
SOLAR + STORAGE Β· PJMSolar + storage project AG2-542, Rockingham County
Solar + storage project AG2-542, Rockingham County is a 70.0 MW solar + storage request withdrawn in the PJM interconnection queue, in Rockingham County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-542
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Knight Energy Center, LLC
- Connection point (POI)
- North Shenandoah βΓΓ¬ Merck 115 kV
- Location
- Rockingham County, Virginia
- Technology
- Solar: 70.0 MW Β· Battery
- Total requested
- 70.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 31 March 2021
- Proposed online date
- June 2024
- Withdrawn
- March 2025
Location
Marker shows the centre of Rockingham County; the queue data does not give exact sites.
Other requests in Rockingham County
- Prospect PowerBattery storage Β· 200 MW Β· agreement signed
- Sunridge SolarSolar Β· 50.0 MW Β· agreement signed
- Battery storage project AJ1-002, Rockingham CountyBattery storage Β· 100 MW Β· in study
- Solar project AH2-399, Rockingham CountySolar Β· 20.0 MW Β· in study
- Solar project AH2-400, Rockingham CountySolar Β· 20.0 MW Β· in study
- Solar project AH2-105, Rockingham CountySolar Β· 16.0 MW Β· in study
- HP Hood Generation FacilityGas Β· 12.0 MW Β· built
- Solar + storage project AG2-529, Rockingham CountySolar + storage Β· 152 MW Β· withdrawn
- Lost River WFOnshore wind Β· 130 MW Β· withdrawn
- Battery storage project AG1-151, Rockingham CountyBattery storage Β· 100 MW Β· withdrawn
- Battery storage project AG1-137, Rockingham CountyBattery storage Β· 100 MW Β· withdrawn
- Skyline SolarSolar Β· 73.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem