πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR + STORAGE Β· WEST

Solar + storage project G0729, Douglas County

Solar + storage project G0729, Douglas County is a 450 MW solar + storage request withdrawn in the West interconnection queue, in Douglas County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0729
Grid region
West (non-ISO utilities)
Connection point (POI)
Grand Coulee - Chief Joseph No 1 230 kV line; Grand Coulee - Chief Joseph No 2 230 kV line; or Grand Coulee - Chief Joseph No 3 500 kV line
Location
Douglas County, Washington
Technology
Solar: 300 MW Β· Battery: 150 MW
Total requested
450 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
4 February 2022
Proposed online date
December 2025

Location

Marker shows the centre of Douglas County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Douglas County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem