United States βΊ Grid βΊ Interconnection queues βΊ Iowa
GAS Β· MISOGas project E0025, Linn County
Gas project E0025, Linn County is a 987 MW gas request withdrawn in the MISO interconnection queue, in Linn County, Iowa, connecting to Interstate Power and Light Company (IPL).
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2025 (completed)
- Withdrawn / abandonedNov 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- E0025
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Interstate Power and Light Company (IPL)
- Developer
- Interstate Power and Light Company (IPL)
- Connection point (POI)
- Morgann Valley - Beverly 345kV
- Location
- Linn County, Iowa
- Technology
- Gas: 987 MW
- Total requested
- 987 MW
- Service type
- Network resource (NRIS)
- Study phase
- Request Status: Withdrawn; Post GIA Status: Not started
- Queue status
- Withdrawn
- Entered queue
- 6 August 2025
- Proposed online date
- February 2028
- Withdrawn
- November 2025
Location
Marker shows the centre of Linn County; the queue data does not give exact sites.
Other requests in Linn County
- Solar project J504, Linn CountySolar Β· 50.0 MW Β· agreement signed
- Gas project E0050, Linn CountyGas Β· 987 MW Β· in study
- Nuclear project J3932, Linn CountyNuclear Β· 646 MW Β· in study
- Solar project J2268, Linn CountySolar Β· 400 MW Β· in study
- Battery storage project J2469, Linn CountyBattery storage Β· 300 MW Β· in study
- Replacing 244 MW of Solar with Nuclear; Duane ArnoldNuclear Β· 251 MW Β· in study
- Solar project J1444, Linn CountySolar Β· 200 MW Β· in study
- Replacing 200 MW of Solar with Nuclear; J1444Nuclear Β· 200 MW Β· in study
- Battery storage project J4155, Linn CountyBattery storage Β· 195 MW Β· in study
- Replacing 100 MW of Solar with Nuclear; Duane ArnoldNuclear Β· 100 MW Β· in study
- Battery storage project J2120, Linn CountyBattery storage Β· 100 MW Β· in study
- Gas project J1359, Linn CountyGas Β· 95.0 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem