Solar project 76, Grant County

Solar project 76, Grant County is a 200 MW solar request withdrawn in the West interconnection queue, in Grant County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
76
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Wanapum - Saddle Mt 230 kV line
Location
Grant County, Washington
Technology
Solar: 200 MW
Total requested
200 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
27 November 2018
Proposed online date
December 2020

Location

Marker shows the centre of Grant County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Grant County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem