πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Oregon

WIND + STORAGE Β· WEST

Wind + storage project 23-225, Columbia County

Wind + storage project 23-225, Columbia County is a 400 MW wind + storage request withdrawn in the West interconnection queue, in Columbia County, Oregon, connecting to Portland General Electric.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23-225
Grid region
West (non-ISO utilities)
Utility / transmission owner
Portland General Electric
Connection point (POI)
Trojan to Harborton 230kV line
Location
Columbia County, Oregon
Technology
Wind: 400 MW Β· Battery
Total requested
400 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
3 March 2023
Proposed online date
September 2028

Location

Marker shows the centre of Columbia County; the queue data does not give exact sites.

Power plants in Oregon Β· Transmission lines in Oregon

Other requests in Columbia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem