SOLAR Β· MISOSolar project J3494, Greene County
Solar project J3494, Greene County is a 175 MW solar request withdrawn in the MISO interconnection queue, in Greene County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3494
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- TH Pfizer Jct. - Worthington (HED)
- Location
- Greene County, Indiana
- Technology
- Solar: 175 MW
- Total requested
- 175 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 15 April 2024
- Proposed online date
- September 2028
- Withdrawn
- September 2025
Location
Marker shows the centre of Greene County; the queue data does not give exact sites.
Other requests in Greene County
- Solar + storage project J3114, Greene CountySolar + storage Β· 300 MW Β· in study
- Solar project J3495, Greene CountySolar Β· 220 MW Β· in study
- Solar project J2987, Greene CountySolar Β· 200 MW Β· in study
- Solar project J2747, Greene CountySolar Β· 160 MW Β· in study
- SurplusBattery storage Β· 150 MW Β· in study
- Solar project J1641, Greene CountySolar Β· 150 MW Β· in study
- Solar + storage project J2826, Greene CountySolar + storage Β· 125 MW Β· in study
- Solar + storage project J3113, Greene CountySolar + storage Β· 300 MW Β· withdrawn
- Solar project J1419, Greene CountySolar Β· 250 MW Β· withdrawn
- Battery storage project J2585, Greene CountyBattery storage Β· 240 MW Β· withdrawn
- Solar project J1405, Greene CountySolar Β· 140 MW Β· withdrawn
- Battery storage project J3000, Greene CountyBattery storage Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem