GAS Β· WESTGas project GI-1107, Divide County
Gas project GI-1107, Divide County is a 2.0 MW gas request withdrawn in the West interconnection queue, in Divide County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2011 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-1107
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Williston 115kV
- Location
- Divide County, North Dakota
- Technology
- Gas: 2.0 MW
- Total requested
- 2.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 23 November 2011
- Proposed online date
- January 2012
Location
Marker shows the centre of Divide County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem