Gas project GI-1107, Divide County

Gas project GI-1107, Divide County is a 2.0 MW gas request withdrawn in the West interconnection queue, in Divide County, North Dakota, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-1107
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Connection point (POI)
Williston 115kV
Location
Divide County, North Dakota
Technology
Gas: 2.0 MW
Total requested
2.0 MW
Service type
Energy only (ERIS)
Study phase
IAP
Queue status
Withdrawn
Entered queue
23 November 2011
Proposed online date
January 2012

Location

Marker shows the centre of Divide County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem