United States βΊ Grid βΊ Interconnection queues βΊ Tennessee
SOLAR + STORAGE Β· SOUTHEASTSolar + storage project 474, Obion County
Solar + storage project 474, Obion County is a 180 MW solar + storage request withdrawn in the Southeast interconnection queue, in Obion County, Tennessee, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 474
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Obion County, Tennessee
- Technology
- Solar: 180 MW Β· Battery
- Total requested
- 180 MW
- Queue status
- Withdrawn
- Entered queue
- 21 April 2021
Location
Marker shows the centre of Obion County; the queue data does not give exact sites.
Power plants in Tennessee Β· Transmission lines in Tennessee
Other requests in Obion County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem