πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

OTHER Β· MISO

Other project G161, Iron County

Other project G161, Iron County is a 110 MW other request withdrawn in the MISO interconnection queue, in Iron County, Wisconsin.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2001 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G161
Grid region
MISO (Midcontinent)
Connection point (POI)
Unknown
Location
Iron County, Wisconsin
Technology
Other: 110 MW
Total requested
110 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
1 December 2001
Proposed online date
June 2003

Location

Marker shows the centre of Iron County; the queue data does not give exact sites.

Power plants in Wisconsin Β· Transmission lines in Wisconsin

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem