Solar + storage project Q69, San Bernardino County

Solar + storage project Q69, San Bernardino County is a 300 MW solar + storage request withdrawn in the West interconnection queue, in San Bernardino County, California, connecting to Los Angeles Department of Water and Power.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q69
Grid region
West (non-ISO utilities)
Utility / transmission owner
Los Angeles Department of Water and Power
Connection point (POI)
Mead-Victorville 287kV Line
Location
San Bernardino County, California
Technology
Solar: 200 MW Β· Battery: 100 MW
Total requested
300 MW
Study phase
Facility Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
September 2022

Location

Marker shows the centre of San Bernardino County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in San Bernardino County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem