United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
SOLAR + STORAGE Β· PJMSolar + storage project AH2-192
Solar + storage project AH2-192 is a 95.0 MW solar + storage request withdrawn in the PJM interconnection queue, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH2-192
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Wharton 138 kV
- Location
- West Virginia
- Technology
- Solar: 95.0 MW Β· Battery
- Total requested
- 95.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 8 March 2022
- Proposed online date
- March 2024
- Withdrawn
- October 2025
Location
No county location in the queue data.
Power plants in West Virginia Β· Transmission lines in West Virginia
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem